Wulin Gate Passenger Wharf, completed in September 1976, boasts a spacious layout with a total shoreline length of 198 meters. The wharf’s construction cost was 1 million yuan at the time.
The waiting hall, featuring a grid structure and a glass curtain wall, was completed in December 1978. This design allows bright light to pour in from all directions, enhancing the hall’s openness and spaciousness.
The wharf operates 24 hours a day, all year round. Boat departure times are subject to the daily operating conditions.