Wulinmen Dock

Wulinmen Passenger Dock boasts a spacious layout— with a total shoreline length of 198 meters, com[...]

Wulinmen Passenger Dock boasts a spacious layout— with a total shoreline length of 198 meters, completed in September 1976. The waiting hall, featuring a grid structure and glass curtain walls, was finished in December 1978. These architectural elements allow for an influx of bright light from all directions, making the entire hall more square and spacious. The construction of the dock at that time cost 1 million yuan RMB. It is open all year round, with departure times subject to the daily opening conditions.

Leave a Comment

Your email address will not be published. Required fields are marked *